UYANG PU Timing Belt is a high-performance synchronous belt made from thermoplastic polyurethane and reinforced with high-tensile cords (steel, Kevlar/aramid, or stainless steel). It delivers accurate positioning, stable speed ratio, and zero slip, making it suitable for precision power transmission and motion control.
UYANG PU Timing Belt is a high-performance synchronous belt made from thermoplastic polyurethane and reinforced with high-tensile cords (steel, Kevlar/aramid, or stainless steel). It delivers accurate positioning, stable speed ratio, and zero slip, making it suitable for precision power transmission and motion control.
Body: Thermoplastic Polyurethane (PU)
Tensile Cords: Steel / Aramid (Kevlar) / Stainless steel
Tooth Profiles: AT, T, HTD, STD, RPP (others on request)
Optional Coatings: PAZ (tooth side), PAR (back side), PAZ + PAR
UYANG PU TIMING BELT
| Model(mm) | AT5 | AT10 | AT15 | AT20 | T5 | T10 | T20 |
| Rated Load of opening belts( 50mm/N) | 3410 | 7760 | 7240 | 7255 | 1764 | 4980 | 7250 |
| Maximum Load of thermoweld belts(50mm/N) | 1705 | 3880 | 3610 | 3630 | 882 | 2490 | 3632 |
| Breaking load of opening belts ( 50mm/N) | 12390 | 32440 | 30220 | 30260 | 7230 | 18760 | 30250 |
| Weight 1m ( kg/50mm) | 0.16 | 0.30 | 0.34 | 0.38 | 0.104 | 0.22 | 0.37 |
| Model(mm) | HTD3M | HTD5M | HTD8M | HTD14M | STD5M | STD8M | L | XL | H | XH |
| Rated Load of opening belts( 50mm/N) | 1560 | 4960 | 7210 | 12730 | 4960 | 7210 | 3410 | 1480 | 5120 | 7180 |
| Maximum Load of thermoweld belts(50mm/N) | 780 | 2480 | 3605 | 6365 | 2480 | 3605 | 1705 | 740 | 2560 | 3590 |
| Breaking load of opening belts ( 50mm/N) | 6500 | 18700 | 31100 | 48870 | 18700 | 31100 | 11700 | 6160 | 18790 | 29890 |
| Weight 1m ( kg/50mm) | 0.10 | 0.23 | 0.36 | 0.58 | 0.23 | 0.36 | 0.195 | 0.122 | 0.21 | 0.55 |
| Model(mm) | P1 | P2 | P3 | P4 |
| Rated Load of opening belts( 50mm/N) | 810 | 1755 | 2500 | 3850 |
| Type | P (mm) | H (mm) | Ht (mm) |
| HTD3M | 3.0 | 2.2 | 1.3 |
| HTD5M | 5.0 | 3.7 | 2.2 |
| HTD8M | 8.0 | 5.6 | 3.6 |
| HTD14M | 14.0 | 10.0 | 6.43 |
| Type | P (mm) | H (mm) | Ht (mm) | W (mm) |
| H | 12.7 | 4.3 | 2.29 | 4.4 |
| XH | 22.225 | 11.2 | 6.35 | 7.94 |
| L | 9.525 | 3.6 | 1.9 | 3.2 |
| XL | 5.08 | 2.3 | 1.27 | 1.37 |
| Type | P (mm) | H (mm) | Ht (mm) | W (mm) |
| AT5 | 5.0 | 2.7 | 1.2 | 2.5 |
| AT10 | 10.0 | 4.5 | 2.5 | 5.0 |
| AT20 | 20.0 | 8.0 | 5.0 | 10.0 |
| Type | P (mm) | H (mm) | Ht (mm) | W (mm) |
| T5 | 5.0 | 2.2 | 1.2 | 1.8 |
| T10 | 10.0 | 4.5 | 2.5 | 3.5 |
| T20 | 20.0 | 3.6 | 5.0 | 6.5 |
| Type | P (mm) | H (mm) | Ht (mm) |
| STD3M | 3.0 | 2.5 | 1.3 |
| STD5M | 5.0 | 3.4 | 1.91 |
| STD8M | 8.0 | 5.1 | 3.05 |
| STD10M | 20.0 | 13.2 | 8.4 |
| Type | P (mm) | H (mm) | Ht (mm) |
| RPP5M-PAZ | 5.0 | 3.8 | 2.0 |
| RPP8M-PAZ | 8.0 | 5.4 | 3.2 |
| RPP14M-PAZ | 14.0 | 10.0 | 6.0 |
| Type | H (mm) |
| P1 | 1.0 |
| P2 | 2.0 |
| P3 | 3.0 |
| P4 | 4.0 |
| Type | P (mm) | H (mm) | Ht (mm) | B(mm) | H (mm) |
| TG5 | 5 | 2.2 | 1.2 | 5 | 4 |
| TG10K6 | 10 | 4.5 | 2.5 | 6 | 4 |
| TG10K13 | 10 | 4.5 | 2.5 | 6 | 6.5 |
| TG20 | 20 | 8 | 5 | 13 | 6.5 |
| ATG10 | 10 | 4.5 | 2.5 | 13 | 6.5 |
| ATG30 | 20 | 8 | 5 | 13 | 6.5 |
| NGH13 | 12.7 | 4.3 | 2.29 | 13 | 6.5 |
Reliable delivery schedules and warehousing support.
Competitive pricing to maximize overall value.
Diverse options to cater to all market segments.
Flexible MOQ Support with all types of goods;
Personalized logo customization on the products
Provide online technical support for all product usage and installation processes
Quick first response to all inquiry and questions
Provide quality images, Video to enhance sales revenue
Efficient production and ship within 15 days at the fastest.
Generally it is 10-15 days, if peak season, it will be about 15-20 day safter receiving the deposit
1. Confirmed Specification: thickness,color, plies,characteristic, and industry;
2. Samples sending: we send samples for you check.or you send us samples if customized belt.
3. Confirm Order: Signing sales contract after samples confirmed.
4. Deposit: 30% deposit before mass production.
5. Production arranged : we will process the production.
6. Remaining payment: after inspection, balance before shipment.
7. Shipping: we will ship the goods to destination port.
8. Confirm bill of loading/commercial invoice/packing list/certificate of origin;