UYANG BELTING shallow-grass (浅草纹) silicone molds accurately transfer the belt’s anti-slip texture into hot-press or vulcanized splice areas, ensuring consistent grip, appearance and cleanability across the entire conveyor surface.
UYANG BELTING shallow-grass (浅草纹) silicone molds accurately transfer the belt’s anti-slip texture into hot-press or vulcanized splice areas, ensuring consistent grip, appearance and cleanability across the entire conveyor surface.
Key benefits
Texture continuity — reproduces the shallow-grass pattern at the splice so there’s no change in grip or product handling.
Durable & heat-resistant — made from high-temperature silicone suited for repeated hot-pressing and vulcanizing cycles.
Professional, hygienic finish — produces smooth, low-profile joints that match the rest of the belt visually and functionally, reducing product catch points and easing cleaning.
Typical specifications & options
Material: high-temperature silicone (food-grade options on request)
Pattern: standard shallow-grass pitch/depth (custom pattern matching available)
Sizes: standard sheets or custom cut to belt width and splice length
Thickness: engineered for optimal pattern transfer under recommended press settings
Compatibility: for PVC and PU conveyor belts with diamond/anti-slip surfaces.
How it’s used (quick steps)
Prepare belt ends—clean and trim to even edges.
Insert splice film (if used) and align the belt ends in the hot-press.
Position the shallow-grass silicone mold over the splice area with the patterned side facing the belt.
Apply heat and pressure per belt/splice press parameters.
Allow to cool; remove mold and inspect the pattern transfer.
Finish edges and test the joint under working load.
Applications
Factory splices and on-site repairs for diamond-top PVC/PU belts in food, packaging, logistics, and light industry.
Any production line where consistent anti-slip performance and uniform appearance across splices are required.
Why choose our shallow-grass silicone molds
Precision pattern transfer keeps product handling consistent and reduces rework. Durable, customizable molds help maintain hygienic surfaces and professional-looking splices—saving time and improving line reliability.
Horaires de livraison fiables et assistance d'entreposage.
Prix compétitifs pour maximiser la valeur globale.
Diverses options pour répondre à tous les segments de marché.
Support flexible du MOQ avec tous les types de marchandises;
Personnalisation du logo personnalisé sur les produits
Fournir un support technique en ligne pour tous les processus d'utilisation des produits et d'installation
Première réponse rapide à toutes les enquêtes et aux questions
Fournir des images de qualité, une vidéo pour améliorer les revenus de vente
Production et expédition efficaces dans les 15 jours au plus rapide.
Généralement, c'est 10-15 jours, si la haute saison, ce sera environ 15-20 jours safter recevant le dépôt
1. Spécification confirmée: épaisseur, couleur, plis, caractéristique et industrie;
2.
3. Confirmer la commande: signature du contrat de vente après les échantillons confirmés.
4. Dépôt: 30% de dépôt avant production de masse.
5. Production organisée: nous traiterons la production.
6. Paiement restant: après inspection, solde avant expédition.
7. Expédition: nous expédierons les marchandises au port de destination.
8. Confirmer le projet de loi de chargement {{url_placeholder_0}} facture {{url_placeholder_1}} list {{url_placeholder_2}} d'origine;