The UYANG Vulcanizing Press features a durable aluminum alloy frame with precise dual heating plates and an integrated water cooling system. It heats up to 180°C in 20–30 minutes and cools rapidly, ensuring efficient splicing for PVC conveyor belts. With intelligent digital controls, adjustable airbag pressure, and sturdy stainless steel platens, it delivers reliable, high-quality joints for industrial applications.
The UYANG Vulcanizing Press features a durable aluminum alloy frame with precise dual heating plates and an integrated water cooling system. It heats up to 180°C in 20–30 minutes and cools rapidly, ensuring efficient splicing for PVC conveyor belts. With intelligent digital controls, adjustable airbag pressure, and sturdy stainless steel platens, it delivers reliable, high-quality joints for industrial applications.
Water Cooled Splice Press:
High-precision temperature control
Fast heating and cooling Durable aluminum alloy frame
Intelligent automatic control
Adjustable airbag pressure (0–3.0 kg)
UYANG Vulcanizing Press – Precision Splicing for PVC Conveyor Belts
The UYANG Vulcanizing Press is expertly engineered for fast, precise, and reliable PVC conveyor belt splicing. Built with a full aluminum alloy frame, it combines lightweight design with outstanding durability. The upper and lower platens are equipped with high-quality laser-cut silicone heating plates and an integrated water cooling system, ensuring fast and uniform temperature control.
With dual-sided heating, the press reaches up to 180°C in just 20–30 minutes. Once heating stops, the system cools rapidly from 180°C to 90°C in 3–5 minutes, dramatically improving efficiency. Temperature accuracy is tightly controlled within ±2°C, with temperature difference across platens less than 3°C, meeting the high demands of industrial PVC belt splicing.
Key features include:
Adjustable airbag pressure (0–3.0 kg) for optimal joint quality
Intelligent control system: auto heating, auto temperature control, and auto shutoff
Durable stainless steel platens and reinforced girders for long-term performance
Integrated water pump for convenient operation and cooling flexibility
Ideal for professional splicing workshops and on-site maintenance where precision, speed, and consistency matter.
Modèle | UY600 | UY900 | UY1000 | UY1200 | UY1600 | UY2000 |
Effective Length (mm) | 600 | 900 | 1000 | 1200 | 1600 | 2000 |
Effective Width (mm) | 150 | 150 | 150 | 150 | 150 | 150 |
Weight upper Part (KG) | 18 | 30 | 35 | 35 | 57 | 94 |
Weight Lower Part (KG) | 20 | 30 | 41 | 41 | 63 | 102 |
Total Weight (KG) | 45 | 65 | 87 | 87 | 125 | 196 |
Overall Length (mm) | 720 | 1020 | 1410 | 1410 | 1910 | 2420 |
Overall Height (mm) | 310 | 310 | 310 | 310 | 390 | 390 |
Max Pressure (Bar) | 2 | 2 | 2 | 2 | 2 | 2 |
Max Temperature (℃) | 200 | 200 | 200 | 200 | 200 | 200 |
Packaging List(L*W*H) (mm) | 1460*500*540 | 1670*520*540 | 2050*480*540 | 2060*480*540 | 2450*550*490 | 2950*600*490 |
Packing Weight (KG) | 72 | 90 | 135 | 145 | 200 | 264 |
Power(W) | 2016 | 3024 | 3696 | 3300 | 5760 | 7560 |
Horaires de livraison fiables et assistance d'entreposage.
Prix compétitifs pour maximiser la valeur globale.
Diverses options pour répondre à tous les segments de marché.
Support flexible du MOQ avec tous les types de marchandises;
Personnalisation du logo personnalisé sur les produits
Fournir un support technique en ligne pour tous les processus d'utilisation des produits et d'installation
Première réponse rapide à toutes les enquêtes et aux questions
Fournir des images de qualité, une vidéo pour améliorer les revenus de vente
Production et expédition efficaces dans les 15 jours au plus rapide.
Généralement, c'est 10-15 jours, si la haute saison, ce sera environ 15-20 jours safter recevant le dépôt
1. Spécification confirmée: épaisseur, couleur, plis, caractéristique et industrie;
2.
3. Confirmer la commande: signature du contrat de vente après les échantillons confirmés.
4. Dépôt: 30% de dépôt avant production de masse.
5. Production organisée: nous traiterons la production.
6. Paiement restant: après inspection, solde avant expédition.
7. Expédition: nous expédierons les marchandises au port de destination.
8. Confirmer le projet de loi de chargement {{url_placeholder_0}} facture {{url_placeholder_1}} list {{url_placeholder_2}} d'origine;