Uyang Billing -Produkte

Water Cooled Splice Press- For PVC PU Conveyor Belt-Uyang Belting

The UYANG Vulcanizing Press features a durable aluminum alloy frame with precise dual heating plates and an integrated water cooling system. It heats up to 180°C in 20–30 minutes and cools rapidly, ensuring efficient splicing for PVC conveyor belts. With intelligent digital controls, adjustable airbag pressure, and sturdy stainless steel platens, it delivers reliable, high-quality joints for industrial applications.

Water Cooled Splice Press- For PVC PU Conveyor Belt-Uyang Belting

The UYANG Vulcanizing Press features a durable aluminum alloy frame with precise dual heating plates and an integrated water cooling system. It heats up to 180°C in 20–30 minutes and cools rapidly, ensuring efficient splicing for PVC conveyor belts. With intelligent digital controls, adjustable airbag pressure, and sturdy stainless steel platens, it delivers reliable, high-quality joints for industrial applications.

Produktdetails

Water Cooled Splice Press:

  • High-precision temperature control

  • Fast heating and cooling Durable aluminum alloy frame

  • Intelligent automatic control

  • Adjustable airbag pressure (0–3.0 kg)

water Cooled Splice Press

UYANG Vulcanizing Press – Precision Splicing for PVC Conveyor Belts

The UYANG Vulcanizing Press is expertly engineered for fast, precise, and reliable PVC conveyor belt splicing. Built with a full aluminum alloy frame, it combines lightweight design with outstanding durability. The upper and lower platens are equipped with high-quality laser-cut silicone heating plates and an integrated water cooling system, ensuring fast and uniform temperature control.

With dual-sided heating, the press reaches up to 180°C in just 20–30 minutes. Once heating stops, the system cools rapidly from 180°C to 90°C in 3–5 minutes, dramatically improving efficiency. Temperature accuracy is tightly controlled within ±2°C, with temperature difference across platens less than 3°C, meeting the high demands of industrial PVC belt splicing.

Key features include:

  • Adjustable airbag pressure (0–3.0 kg) for optimal joint quality

  • Intelligent control system: auto heating, auto temperature control, and auto shutoff

  • Durable stainless steel platens and reinforced girders for long-term performance

  • Integrated water pump for convenient operation and cooling flexibility

Ideal for professional splicing workshops and on-site maintenance where precision, speed, and consistency matter.

Modell UY600 UY900 UY1000 UY1200 UY1600 UY2000
Effective Length (mm) 600 900 1000 1200 1600 2000
Effective Width (mm) 150 150 150 150 150 150
Weight upper Part  (KG) 18 30 35 35 57 94
Weight Lower Part  (KG) 20 30 41 41 63 102
Total Weight (KG) 45 65 87 87 125 196
Overall Length (mm) 720 1020 1410 1410 1910 2420
Overall Height (mm) 310 310 310 310 390 390
Max Pressure (Bar) 2 2 2 2 2 2
Max Temperature () 200 200 200 200 200 200
Packaging List(L*W*H) (mm) 1460*500*540 1670*520*540 2050*480*540 2060*480*540 2450*550*490 2950*600*490
Packing Weight (KG) 72 90 135 145 200 264
Power(W) 2016 3024 3696 3300 5760 7560

Differenzierte Dienstleistungen: Genau Ihren Geschäftsanforderungen erfüllen

Für Distributor & Großhändler:

Flexible Lieferzeit

Zuverlässige Lieferpläne und Lagerunterstützung.

Hohe Kosteneffizienz

Wettbewerbspreise zur Maximierung des Gesamtwerts.

Breite Produktauswahl

Verschiedene Optionen, um alle Marktsegmente gerecht zu werden.

Für einen individuellen Geschäftsinhaber von Gürtel:

Niedriger MOQ

Flexibler MOQ -Unterstützung mit allen Arten von Waren;

Benutzerdefiniertes Logo

Personalisierte Logo -Anpassung an den Produkten

One-Stop-Service-Support

Bieten Sie den technischen Online -Support für alle Produktnutzungs- und Installationsprozesse

Für Einkaufsagenten:

Schnelle Nachrichtenantwort

Schnelle erste Antwort auf alle Anfragen und Fragen

F & E -Ressourcen

Stellen Sie Qualitätsbilder und Video zur Verfügung, um den Umsatzumsatz zu steigern

15 Tage schnell Lieferung

Effiziente Produktion und Schiff innerhalb von 15 Tagen am schnellsten.

Verwandte Produkt

Häufig gestellte Fragen

Im Allgemeinen sind es 10-15 Tage, wenn die Hochsaison etwa 15 bis 20 Tage lang ist, erhält Safter die Kaution

1. Bestätigte Spezifikation: Dicke, Farbe, Lagen, Merkmale und Industrie;
2. Proben Senden: Wir senden Proben für Sie check.
3. Bestätigen Sie die Bestellung: Unterzeichnung des Verkaufsvertrags nach Bestätigung der Stichproben.
4. Kaution: 30% Einzahlung vor der Massenproduktion.
5. Produktion arrangiert: Wir werden die Produktion verarbeiten.
S.
7. Versand: Wir versenden die Waren an den Bestimmungshafen.
8. Bestätigen Sie die Belastungsrechnung {{url_placeholder_0}} Invoice {{url_placeholder_1}} list {{url_placeholder_2}} des Ursprungs;

Lassen Sie uns noch heute eine Verbindung herstellen, um die richtige Lösung zu finden!