UYANG BELTING PRODUCTS

Aramid Reinforced V-belts with Supergrip Coating -UYANG BELTING

UYANG’s  V-belts combine aramid fiber cores for strength with herringbone-grip surfaces and self-adhesive backing for secure, easy-install power transmission in demanding applications.

Aramid Reinforced V-belts with Supergrip Coating -UYANG BELTING

UYANG’s  V-belts combine aramid fiber cores for strength with herringbone-grip surfaces and self-adhesive backing for secure, easy-install power transmission in demanding applications.

Product Details

Advantages:
✓ Stable operation on 30°-45° inclined conveyors
✓ 5x longer lifespan than standard V-belts
✓ 60% faster installation

Aramid Reinforced V-belts

Aramid Reinforced V-belts with Supergrip Coating -UYANG BELTING

Key Features:
• Dual-reinforced construction: Aramid fiber core + herringbone grip surface
• Peel-and-stick installation: 50N/cm adhesive strength
• 40% improved friction coefficient
• Heavy-duty 1500N/mm² tensile strength

Applications:

  • Mining inclined conveyor systems

  • Port heavy-load handling equipment

  • Automated warehouse elevators

Differentiated Services: Precisely Meeting Your Business Needs

For Distributor & Wholesaler:

Flexible Delivery Time

Reliable delivery schedules and warehousing support.

High Cost-Effectiveness

Competitive pricing to maximize overall value.

Wide Product Selection

Diverse options to cater to all market segments.

For Customized belt Business Owner:

Low MOQ

Flexible MOQ Support with all types of goods;

Custom Logo

Personalized logo customization on the products

One-Stop Service support

Provide online technical support for all product usage and installation processes

For Purchasing Agent:

Quick Message Response

Quick first response to all inquiry and questions

R& D Resources

Provide quality images, Video to enhance sales revenue

15 Days Fast Delivery

Efficient production and ship within 15 days at the fastest.

RELATED PRODUCT

Frequently asked questions

Generally it is 10-15 days, if peak season, it will be about 15-20 day safter receiving the deposit

1। নিশ্চিত করা স্পেসিফিকেশন: বেধ, রঙ, প্লিজ, বৈশিষ্ট্যযুক্ত এবং শিল্প;
2। নমুনা প্রেরণ: আমরা আপনার জন্য নমুনাগুলি প্রেরণ করি C
3। অর্ডার নিশ্চিত করুন: নমুনাগুলি নিশ্চিত হওয়ার পরে বিক্রয় চুক্তিতে স্বাক্ষর করা।
4। আমানত: ভর উত্পাদনের আগে 30% আমানত।
5। উত্পাদন সাজানো: আমরা উত্পাদন প্রক্রিয়া করব।
।। বাকি অর্থ প্রদান: পরিদর্শন করার পরে, চালানের আগে ভারসাম্য।
7। শিপিং: আমরা পণ্যগুলি গন্তব্য বন্দরে প্রেরণ করব।
8। লোডিংয়ের বিলটি নিশ্চিত করুন {{url_placeholder_0}} চালান {{url_placeholder_1}} তালিকা {{url_placeholder_2}}}}}}}}};;

আসুন সঠিক সমাধানটি খুঁজে পেতে আজই সংযুক্ত হই!